Generator & UPS sizing
A set is limited by both kW and kVA. Check the load against each, and the largest motor start.
Try an example
Convert from
More optionsThree-phase · Set's rated power factor 0.8 · Spare capacity 20 %
100 kW at PF 0.85
How it's calculated
- Running kVA = kW ÷ load power factor.
- Set kVA is the largest of kW ÷ rated power factor, running kVA, and running kVA + motor start, plus spare capacity.
A first estimate: check the maker's sizing tool. Generators are usually rated at 0.8 PF, UPS units at 0.9 or higher, so set the rated power factor to match. Motor starting kVA is on the motor's code letter, or about 6 kVA per hp across the line.
Worked examples
100 kW at PF 0.85
- Set size, at least: 150 kVA / 120 kW
- Running kVA: 117.6 kVA
80 kW at PF 0.9
- Set size, at least: 178.7 kVA / 142.9 kW
- Running kVA: 88.9 kVA
- Running plus motor start: 148.9 kVA